In the Jan. & Feb. of this year, the investment in fixed assets totaled 529.4 billion yuan, a year-on-year rise of 26.6%. Especially, the investment from the state-owned and state share-holding enterprises reached 250.0 billion yuan, up 16.4%; that in real estate totaled 143.6 billion yuan, up 19.7%.
Analyzed by administrative relationship, the projects at the central government level totaled 54.5 billion yuan, a year-on-year rise of 19.3%; the investment of the local projects totaled 474.9 billion yuan, up 27.5%.
Analyzed by the three-major-category classification, the investment in the primary industry totaled 2.4 billion yuan, a year-on-year rise of 34.5%; that in the secondary industry was 219.5 billion yuan, up 28.8%; that in the tertiary industry was 307.5 billion yuan, a year-on-year rise of 25%.
Analyzed by industry, the investment in coal mining and dressing industry totaled 3.9 billion yuan, a year-on-year rise of 27.3%; that in the electricity, fuel gas and the production and supply of water reached 54.2 billion yuan, up 14.0%; that in the petroleum and natural gas extraction reached 10.8 billion yuan, up 21.4%; that in railway construction was 5.0 billion yuan, up 244.8%; that in the non-metal mining & related products totaled 8.6 billion yuan, up 46%; that in the ferrous-metal mining, smelting and pressing of processing industry totaled 16.2 billion yuan, up 1.6%; that in the non-ferrous metal mining, smelting and pressing of processing industry totaled 4.2 billion yuan, up 23.6%.
Analyzed by ownership type, the investment in domestic-funded enterprises totaled 449.5 billion yuan, a year-on-year rise of 27.3%; that in the foreign-funded enterprises reached 30.8 billion yuan, up 6.7%; that in the Hongkong, Macao and Taiwan investment enterprises totaled 47.6 billion yuan, up 33.2%.
Analyzed by projects under construction and new-started projects, the number of the projects was 48589, a year-on-year up by 9913; the planning investment of projects under construction totaled 9765.2 billion yuan, a year-on-year up 39.8%. the accumulated number of new-started projects was 11723, a year-on-year up by 4140; the planning investment of the new-started projects totaled 634.8 billion yuan, a year-on-year rise of 33.4%.
According to the situation of fund reaching the corresponding projects, The fund of investment reaching the corresponding projects was 939.8 billion yuan, a year-on-year rise of 29.7%. of which, the domestic loan rose 31.9%, the utilized foreign capital went up 34.5%, the fundraising climbed 38.2%.